Technicians mechanically clean all cracks of dirt, loose debris and foreign material. (1/4 inch or wider). Then we thoroughly blow clean cracks and Fill the cracks with rubberized hot-pour crack sealant. Filled cracks will be relieved of excess sealant by striking off the top to form a band of asphalt crack sealant which extends approximately one inch on each side of the filled crack.